RFC, CAB and Change Templates

RFC, CAB and Change Templates product imageClick to enlarge
DESQCON TOOLKIT

RFC, CAB and Change Templates

A change process runs on paperwork that people actually fill in. These templates give your requesters, implementers and CAB a clear form for each moment, with prompts and examples already in place.

WORDEXCEL

  • Download links arrive by email after checkout
  • Fully editable, with no macros
  • Licensed for use inside one organization
8page RFC form with risk grid
6page CAB agenda and minutes pack
200change rows with automatic risk score
5files in the pack

What is in the download

Four Word templates and an Excel register that cover a change from request to review.

DOCX

RFC-Form.docx

Word document, 8 pages
Request and reasonScope and impactRisk assessment gridPlansSchedule and approvalResult
DOCX

Change-Implementation-and-Back-out-Plan.docx

Word document, 8 pages
Pre-checksImplementation stepsVerificationGo or no goBack-out stepsClose out
DOCX

CAB-Agenda-and-Minutes.docx

Word document, 6 pages
AgendaChange summary sheetDecision questionsDecision logMinutes and actions
DOCX

Change-Post-Implementation-Review.docx

Word document, 6 pages
ObjectivesWhy it went that wayActionsModel updates
XLSX

Change-Register-and-Calendar.xlsx

Excel workbook, 5 sheets
Change registerRisk scoreFreeze checkDashboard with chartsLists

From request to review

One template for each moment in the life of a change.

The change path

Use one document for each step.
RequestRFC form
PlanImplementation and back-out plan
AuthorizeCAB pack
ImplementPlan checkpoints
ReviewPost implementation review
TrackChange register

What the Excel register does for you

Yellow cells are for input. Everything else is calculated.
Scores riskHighest of three ratings
Suggests authorityBy type and score
Checks freezesAgainst your freeze periods
Draws chartsDashboard sheet

Look inside before you buy

These are real pages and sheets from the download. Click any image to view it full size.

RFC form cover
RFC risk assessment grid
Implementation steps and verification
CAB summary sheet
Post implementation review
Change register

How it works

From checkout to a working document in three steps.

Get it

Check out securely and open the download links from your email.

Set it up

Enter your freeze periods on the Lists sheet and delete the example rows.

Use it

Send the RFC form to requesters, run the CAB with the pack and log every change.

What you get

  • An 8 page request for change (RFC) form with a risk assessment grid and approval block.
  • An 8 page implementation and back-out plan template with checkpoints and a go or no go decision.
  • A 6 page CAB pack: agenda, summary sheet, decision questions, decision log and minutes.
  • A 6 page post implementation review template for failed, backed out, emergency and major changes.
  • An Excel change register for 200 changes with automatic risk score, suggested authority, freeze period check and a dashboard.

How it helps you

RFCs arrive complete, CAB meetings stay short, and every change leaves a record that stands up to audit. The register shows your success rate and the share of emergency changes.

Who should get it

Change managers, CAB chairs, release managers, engineers who raise or implement changes, and anyone setting up a change process.

How to use it

Give the RFC form to requesters, send the CAB summary sheet two days before each meeting, and use the implementation plan on the day. Review any failed or emergency change with the review template and log everything in the register.

Format

Word (.docx) and Excel (.xlsx). Vendor neutral. Works alongside any ticketing tool.

License and good to know

Single organization license for internal use. You can edit and rebrand the files. You cannot resell or redistribute them.